Feb 23, 2021

The Island Development

Client: Belhasa Six Construct Co. LLC
Task: Transportation of 887,442 ton of armour rock
Location: Juemirah Dubai
Load Port: Stevin Rock, RAK, UAE
Discharge Port: Private Island Juemirah Dubai

The objective of this project is to complete the development of an existing private island and a related shore based marina at Jumeraih. The offshore artificial island existing off the coast of Jumeraih Third and is protected by rock revetment with no inhabitants. The island is having a submerged reef and two emerged detactched breakwaters at the north side for tbeach stabilization.

The aim of the project is to develop a private resort on the above island with ancillary facilities on the shore side for private use.

ReadMore >>

Palm Jumeirah

Client: Van Oord Middle East
Task: Transport of 1.5 million tons of armour rocks
Location Loading Port: Ras Al Khaimah, UAE
Discharge Port: Palm Jumeirah

Van Oord Middle East and Marine Core and Charter came together for the marine transportation and delivery of rock from Stecing Rock Jetty, RAK, UAE to Palm Jumeraih under the Project – Crescent Breakwater Maintenance works on the Palm Jumeraih Development for CommunityCorp LLC.

The Palm is prtected by the Crescent, an 11-Kilometer breakwater. The project involves the marine transportation of rock material, from Stevin Rock, RAK, UAE where it is stockpiled, ready to loading and delivery to the project site at Palm Jumeraih.

The estimated rock to be transported is 1.5 million metric ton. Marine Core and Charter is arranging the transportation and delivery of the Van Oord’s Freight from the point of departure to the point of delivery.

ReadMore >>

Dubai Harbour Master Plan

Client:
Circle GlobalLogistics
Task: Transport of 3 million tons of rocks for the coast of Dubai Harbour’s breakwaters.
Location Loading Port: Ras Al Khaimah
Discharge Port:
Dubai Waterfront

A major new waterfront development featuring the Middle East’s largest marina capable of handling 1400 vessels is to be built on the Dubai waterfront.

A master plan for the project was unveiled by Sheikh Mohammed bin Rashid, the UAE Vice President and Ruler of Dubai. He said that Dubai Harbour “represents a unique and innovative new addition to the region’s tourism land-scape”.

“I am confident that the project will have a highly positive effect on our entire region’s toursim sectore. We are keen to encourage new projects and promote investments that will contrubute to bringin to the region more tourists interested in experiencing this part of the world,” he said.

The 1400-berth marina will increase Dubai’s capacity for handling yachts by almost 50 percent from the current 3000 berths int he Emirate. It will also add the capacity to handle larger yachts of up to 85 meteres in length.

ReadMore >>

Boubyan Island Project

Client: Hyundai e&c
Task: Transportation of small rocks (670,000 tons)
Location: Loading Port: Fujairah Port, UAE
Discharge Port: Boubyan Island, Kuwait

KUWAIT NATIONAL Petroleum Company (KNPC), a subsidiary of Kuwait Petroleum Corporation, plans to build a new liquefied natural gas (LNG) import terminal at Al-Zour in Kuwait, approximately 90km south of the Kuwait’s capital, Kuwait City, near the border with Saudi Arabia.

The project includes the construction of a re-gasification facility, storage tanks and marine facilities. Kuwait National Petroluem Company (KNPC) selected a consortium led by Hyundai Engineering Company (HEC) for the construction of Al-Zour LNG project and Marine Core and Charter (MCC) for the delivery of rock materials and gravel.

Once fully-operational, the facitilty is expected to produce approximately 22 million metric tonnes (MMT) of natural gas a year and will have a storage capacity of 1.8 million m3 of LNG. The liquefication capacity of the terminal will be 30 billion cubic metres a day (bcm/d).

ReadMore >>

Artificial Islands Smaismah Project

Client: Eunsan Shipping & Air Cargo Co. Ltd
Task: Transportation of limestone (1.2 million tons)
Location Loading Port: Mina Saqr, Ras Al Khaima, UAE
Discharge Port: Simasaima-Doha

In 2005, Qatar began the construction of Lusail, a brand new city to the north of Doha on the coast of the Arabian Gulf. Owing to Lusail’s multiple waterways, formwork expoerts were needed to link the cirt’s man made islands.

In 2013, Doka was enlisted to support FCC Construction-Petroserv JV, the joint-venture construction firm tasked with completing two pedestrian bridges. Doka was brought on board to supply pre-assembled formwork materials for the structures, which spanned 90m and 100m, respectively. The structures were built simultaneously, thus doubling the quantity of the formwork materials required.

Ultimately, these bridges will provide a continuous pedestrian pathway around Lusail’s 350-boat marina. Their desings resemble that of a necklace; interlocking eclipses with concrete decks will be suspended by steel cables attached to slender pylons.

The products identified by Doka to support the project constisted of the Staxo 40 loaded-bearing tower and a large-area Top 50 formwork systems. Doka’s Dokaplex formwork sheet, meanwhile, met the requirements of the fair-faced concrete used for the bridges’ decks. Precision panel joins were employed to eliminate the need for rework.

ReadMore >>

Marsa Al Arab, Jumeirah

CLIENT:
Target Engineering Construction co.
TASK:
Transportation of 200,000 ton of 1-500kg quarry run & Crushed rock
LOCATION :
Burj Al Arab Jumeirah, Dubai
LOAD PORT:
Stevin Rock, RAK, UAE
Discharge Port:
Jumeirah Private jetty

Marsa Al Arab is an AED 6.3 billion ($1.7 billion) project to attract tourists in Dubai. This project is built on two islands on both sides of the Burj Al Arab Hotel. The project is divided into two islands. The first island is dedicated to entertainment venues and family tourism. The second island is considered as luxury resort. This project includes a private yacht marina, yacht club, gourmet restaurants, helipad, convention Center, hotels and shopping outlets spread across 20,000 square meters.

ReadMore >>

Umm Qasr Multipurpose Terminal Yard 5 Development, Quay Wall & Marine Works Project

CLIENT:
ENKA INSAAT VE SANAYI A.S.
TASK:
Supply & Transporta􀆟on 500,000 tons
LOCATION:
Umm Qasr Iraq
LOAD PORT:
Stevin Rock, Mina Saqr, Rak, UAE
Discharge Port :
Umm Qasr Iraq private site

The Port of Umm Qasr is located approximately5.2 km south of Basra. This port is the only deep water and largest port in Iraq. Basra is connected to the port by roads and railways. ENKA was awarded the contract by the Aloreen Company on May 7th 2018.

ENKA’s responsibilities under this contract include engineering, procurement and construction activities. The target is to install a blockwork-type quay wall at the end of the basin. This will be the very first block – work-type quay wall to be constructed in Iraq and ENKA is proud to be involved.

ReadMore >>

KUWAIT NATIONAL GUARD CLUB MARINA

CLIENT: China harbor engineering co. ltd
TASK: Transportation of 200,000 ton quarry run
LOCATION :
Kuwait
LOAD PORT :
Stevin Rock, Mina Saqr RAK, UAE
Discharge port:
Funaitees Kuwait

The project consists of constructing a new marina at the KNG club in Funaitis. The new marina will receive around 125 yachts of different sizes, in addition to the officer’s boats and yachts. The marina is connected to the
shore by a bridge or a causeway to give access to boats and pedestrians.
The marina basin consists of a breakwater on all the sides and an entrance from the North. There are seven main berthing piers joined by gangways at the peripheral and connected to the floating pontoons forming the berths.

ReadMore >>