KUWAIT NATIONAL GUARD CLUB MARINA

CLIENT: China harbor engineering co. ltd
TASK: Transportation of 200,000 ton quarry run
LOCATION :
Kuwait
LOAD PORT :
Stevin Rock, Mina Saqr RAK, UAE
Discharge port:
Funaitees Kuwait

The project consists of constructing a new marina at the KNG club in Funaitis. The new marina will receive around 125 yachts of different sizes, in addition to the officer’s boats and yachts. The marina is connected to the
shore by a bridge or a causeway to give access to boats and pedestrians.
The marina basin consists of a breakwater on all the sides and an entrance from the North. There are seven main berthing piers joined by gangways at the peripheral and connected to the floating pontoons forming the berths.